Home >> Solutions >> The new generation of monitoring panel - GP e-mail through Pro-face and other ways to improve the exchange of information
Search
Catalogue
ABB

The new generation of monitoring panel - GP e-mail through Pro-face and other ways to improve the exchange of information

http://www.factoryautmation.com
Article Source:manufacturers Publish Time:2015-9-22

Even in the laboratory has strict requirements GP e-mail improve exchange information Pro-face for GP e-mail improve exchange information Pro-face the air conditioning control system in GP, also can do a job with skill and ease work.

 

Here we will talk about the application of GP's Pro-face in the research center of pharmaceutical manufacturers. The whole building has a number of laboratories with precision equipment. "We have used all of our air conditioning control system technology to create all types of environment, including those offices, business, and public places. However, the highest environmental control requirements are medical equipment and laboratories. These sites must have a stable environment to ensure accurate results. Especially for indoor temperature and air pressure requirements are extremely accurate control.

 

Of course, this is not only to achieve professional air conditioning technology level. To install these devices, you must have an understanding of all other things, such as the overall structure and design of the room. In other words, you must be able to control all the things in the room. In each room the entrance to install a GP touch screen will be able to meet all the requirements.

 

Each room is equipped with a GP to strengthen the data acquisition system centralized monitoring operation.

 

The main reason we chose GP-2500T is because it strengthens our control system, and provides us with more precision air conditioning control. We install a GP in each room, and then connect it to the PLC, which is used to control the temperature, humidity, air pressure, air flow, brightness, and other factors. Just look at the GP, without opening the door, we will be able to detect all the cases in the room, and, the maximum possible to maintain the stability of the room conditions.

 

Each room of the GP unit is connected to the main control room through the Ethernet PC, so we can real-time tracking of the room, such as temperature, pressure, etc.. For example, if there is an open door in the room, there will be an alert to remind us that this will minimize the extent to which we are disturbed, and greatly advance the level of Laboratory environmental control.

 

 

Information platform system makes the information flow smoothly in the clean room.

 

The GP unit created an information platform for the user. When we have something to inform the lab staff, we usually make use of the office phone or mobile phone according to the emergency of things. In a room where there is a pressure control, the phone is very difficult to hear, and the area of the office phone is limited. In this way, no one will be on the phone will be a big problem. We have only one mobile phone number, the general mobile phone in the past must be carefully sterilized.

 

Cleaning room

 

Control air pollution by strictly limiting the flow of small particles

 

"In the end, we have to wait until people leave the lab, which greatly delayed the exchange of information. If we only need to contact a person, we can finally contact, but when we need to contact a number of people at the same time, we must find a more effective way. A customer using a display device equipped with an information system to send text messages to remind us".

 

Disinfection equipment

 

The device uses UV rays and other methods to remove all the bacteria from the clean room. He is like a door between the indoor and outdoor.

 

Now, the company can instantly send up to 300 characters to any one GP, and not just from the master control room, PC can send any network. Information is only one way to transfer, that is GP's "information platform", but the sender can be through the status information (read or not read) to distinguish the information is not read, so that to prevent missing information.

 

When everyone can use the system, the possibility of communication will continue to rise.

 

Because GP is often used in place of the monitoring unit, this is the case, not only the system administrator and many other people want to use them.

 

From this case, we can see that the new concept of the implant can make these systems as a more effective information exchange channels, to ensure that the timely access to information channels. The key is how to improve your communication by using GP.

Related Scheme